• News

06.09.2014

VSC-1: power failure Freihaus, TU Wien, 2014-09-06

VSC-1 unavailable from Saturday, 2014-09-06 02:15 a.m., till Monday, 2014-09-08 04:00 p.m.


A power failure due to a defect transformer in the server room in the Freihaus of the Vienna University of Technology has left the compute nodes of VSC-1 without power supply since Saturday, September 6th, 2014, 02:15 a.m. The problem has been resolved and normal operation of VSC-1 has resumed again on Monday, September 8th, 2014, 04:00 p.m.

Due to the power failure on VSC-1, some services on VSC-2 login nodes have been affected as well. VSC-2 login nodes are fully operational again since early Monday morning (2014-09-08). Running jobs on VSC-2 have never been affected.

Opens external link in new windowStörung Stromversorgung Serverraum Freihaus (german)